Skip to content

Preparation work before operation and control of hydraulic pendulum type plate shearing machine

Preparation work before operation and control of hydraulic pendulum type plate shearing machine:

1, cleaning the oil on the surface of the machine parts, inspection ball valve should be in the open position.

2, each part of the lubrication oil injection.

3. Add 46 hydraulic oil into the oil tank.

4, the machine is grounded, connected to the power supply, check the coordination between the electrical actions.

5, the shear sheet material, in line with the material σ6=45Kg/mm2 σ6=20% if more than, the thickness of the corresponding reduction.

ru_RURussian
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, how can I help?

Contact Us

Fill out the information below to get a free quote and we will get back to you within 24 hours!