Ir al contenido

What are the matters needing attention in the installation and debugging process of 100t hydraulic press brake mold?

1, the adjustment of the 100t hydraulic press brake , before the installation, first of all to adjust the machine performance,

this process must be patient and serious,

check the machine is not dust and used iron debris, etc., necessary cleaning, to reduce the trouble in the later period.

2. Adjust the stroke of the slider, pay attention to check the thickness of the mold and check whether the proportion of the upper and lower modules is normal.

Normally, the module should be controlled at the switch point of the stroke line, which must be paid attention to.

3. Adjustment of the travel module, that is, adjustment of the upper limit point of the module, when the module is at the top, set the switch well,

and reserve the stopping position of the slider, and decelerate the module in the next line, so as to better protect the machine and the mold

4. The adjustment of the gap is mainly to measure the distance between the upper module and the lower module first.

The specific clearance setting is determined according to the plate folded.

5, the Angle adjustment, the Angle adjustment has a certain relationship with the product, generally folding 90° mold,

then the middle Angle must be greater than the Angle of both sides, then its tightness can be carried out according to the adjustment screw,

when bending, can be adjusted through the pressure gauge, to avoid the die edge collapse.

es_ESSpanish
WeCreativez Asistencia WhatsApp
Nuestro equipo de atención al cliente está aquí para responder a sus preguntas. Pregúntenos lo que quiera.
Hola, ¿en qué puedo ayudarte?

Póngase en contacto con nosotros

Rellene la información que aparece a continuación para obtener un presupuesto gratuito y nos pondremos en contacto con usted en 24 horas!.